Large scale works carried out in service yard
Recently we completed some large scale remedial works to the damaged/broken concrete service yard drainage channels at Lakeside Village in Doncaster. The works were completed over a two week period and a traffic management system was put in place to ensure safety for the maintenance operatives, while working in a busy service yard area environment.
The old concrete drainage channel was starting to break up and cause a trip hazard to the visiting public.
Aston Maintenance were able to complete these works in one day, together with the installation of some steel plate supports
The picture shows a 250kg concrete drainage cover being lifted out for the channel